Download PDF | View documents on Sedar
Montreal, October 22, 2019 – Quebec Precious Metals Corporation (TSX.V: CJC, FSE: YXEP, OTC-BB: CJCFF) or the “Company”) is pleased to announce the results of the summer heliborne combined magnetic, radiometric, and induced polarization (“IP”) surveys as well as the prospecting, rock and soil sampling program that was carried out on the Sakami project (see press release of September 24, 2019). QPM improved the definition of known drill targets and identified multiple new drill targets. The defined targets will be tested during the drilling program that is being designed and scheduled to commence later this year. The targets are characterized as follows:
- located along a 13-km mineralized trend striking SSW-NNE that includes the Apple, PĂ©ninsule, Simon, JR and ĂŽle showings (with gold mineralization detected in drillholes, grab and trench samples) and the La Pointe deposit (Figure 1);
- situated at a distance up to 1,500 m from the favourable contact between the Opinaca and La Grande geological subprovinces;
- spatially correlated with a major magnetic discontinuity present along the mineralized trend and sometimes with magnetic structures striking E-W;
- closely associated with iron formations, that are discontinuous and apparently folded; and
- spatially correlated with IP anomalies and gold and arsenic soil geochemical anomalies.
One of the highlights of the program was defining a high priority drill target in the Apple sector (Figure 2). A gold showing discovered in 2000 reported respectively 23.82 g/t Au and 4.73 g/t Au in grab samples. Two additional grab samples selected this summer reported 9.52 g/t Au and 6.37 g/t Au.
In addition, the soil sampling program validated the very encouraging results obtained from the soil sampling program carried out in 2018 (see press release of December 5, 2018) over a distance of approximately 2 km west of the La Pointe gold deposit. This area also includes high grade nickel mineralization from the re-analyses of recovered historical and unanalyzed drill core samples (see press release of October 2, 2019). These results will be subject of a subsequent press release during the fall.
The field work on the Cheechoo-Éléonore Trend, Charles and Blanche projects has been completed. Work on the Opinaca West project is in progress. Results will be available later this fall.
Matheson Joint Venture gold project, Timmins mining camp, Ontario
The Company holds a 50% interest in four non-contiguous blocks totalling 41 single cell mining claims, four patented (surface and mining rights) claims and three leases (surface and mining rights) totalling 13 km2 of the Matheson joint venture project (“Matheson Project”), located 24 km from the Timmins city centre in Ontario. International Explorers and Prospectors Inc. (“IEP”) owns the other 50%. The Company and IEP have agreed to sell their respective interest in the Matheson Project.
The project covers prospective lithologies and structures analogous to the geological setting of the nearby Hoyle Pond gold mine operated by Newmont Goldcorp Corporation. The Hoyle Pond mine has produced 4 million ounces of gold at an average grade of 12 g/t gold from 1985 to 2018, making it one of the highest-grade deposits in the Timmins camp. Mineralization hosted on adjacent and/or nearby projects is not necessarily indicative of mineralization that may be hosted on the Matheson Project.
A number of exploration targets have been identified by past exploration programs but have not been systematically tested by drilling.
The Company has filed a new National Instrument 43-101 Technical Report (“Technical Report”) for the Matheson Project. The Technical Report was prepared by Mr. Paul Chamois, P. Geo., of RPA Inc. (“RPA”), who is an independent qualified person under NI 43-101. The Technical Report can be found on the Company’s website or under the Company’s profile at www.sedar.com. The Company continues to sell its interest in non-core projects or identify partners to pursue exploration (see press release dated May 23, 2019).
Field Work and Quality Assurance/Quality Control
The heliborne mag and radiometric survey and IP surveys were carried out by GDS Data Solutions Inc. (based in Laval) and Geosig Inc. (based in Quebec City) respectively. Processing and interpretation of the geophysical data was performed by Inter Géophysique Inc. (based in Rosemere). Prospecting, rock and soil sampling was done by Consul-Teck Exploration Minière Inc. (based in Val d’Or).
Quality assurance and quality control procedures have been implemented to ensure best practices in sampling and analysis of the rock and soil samples. The samples were delivered, in secure tagged bags, directly to the ALS Minerals laboratory facility in Val-d’Or, Quebec. The samples are weighed and identified prior to sample preparation. All samples are analyzed by aqua regia extraction with an inductively coupled plasma finish coupled with atomic emission spectroscopy (ICP-AES). The analytical procedure for gold is fire assay with AA finish on a 30 g sample (0.005- 10 ppm Au), with a gravimetric finish for assays over 10 ppm Au.
Qualified Persons
Normand Champigny, Eng., Chief Executive Officer of the Company, and Jean-Sébastien Lavallée (OGQ #773), geologist, Vice-President Exploration, director and shareholder of the Company, both Qualified Persons under NI 43- 101 on standards of disclosure for mineral projects, have prepared and approved the technical content of this release.
About RPA
RPA Inc. is a group of technical professionals who have provided advice to the mining industry for more than 30 years. During this time, RPA has grown into a highly respected organization regarded as the specialty firm of choice for resource and reserve work.
About Quebec Precious Metals Corporation
QPM is a gold explorer with a large land position in the highly-prospective Eeyou Istchee James Bay territory, Quebec, near Newmont Goldcorp Corporation’s Éléonore gold mine. QPM’s flagship project is the Sakami project with significant grades and well-defined drill-ready targets. QPM’s goal is to rapidly explore this project to advance it to the mineral resource estimate stage.
For more information please contact:
Jean-François Meilleur
President
Tel.: 514 951-2730
jfmeilleur@qpmcorp.ca
Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
nchampigny@qpmcorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
- November 26, 2024 Quebec Precious Metals Reports Consistent +20m Thick Spodumene-Bearing Pegmatite Up to 150m Deep from its Maiden Drilling Program on its 100%-owned Lithium Ninaaskumuwin Discovery, James Bay, Quebec
- November 07, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- October 31, 2024 The Cree Hunters Economic Security Board, 16 Mining & Exploration Companies Contribute $750,000 For The Reconstruction Initiative Forest Fires Fund 2023, James Bay, Quebec
- October 30, 2024 Quebec Precious Metals Intersects 22.9 m of Spodumene-Bearing Pegmatite in the First Drillhole of its Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, James Bay, Quebec
- October 21, 2024 Quebec Precious Metals Begins Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, Situated Near the Galaxy Project to be Acquired by Rio Tinto, James Bay, Quebec, Announces Private Placement
- September 19, 2024 Quebec Precious Metals Congratulates Harfang Exploration on its High-Grade Gold Discoveries near the Sakami Project and Provides Update on Gold and Lithium Exploration Initiatives in James Bay
- August 09, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- July 17, 2024 Quebec Precious Metals Announces Results of Annual Shareholders Meeting, Grants Deferred Share Units and Stock Options
- June 27, 2024 Quebec Precious Metals Congratulates Ophir on its Spodumene Discovery near the Elmer East Project, James Bay, Quebec
- June 26, 2024 Quebec Precious Metals Granted Financial Support from Quebec Government for Lithium
- June 21, 2024 Quebec Precious Metals Announces Closing of Non-Brokered Private Placement
- May 31, 2024 Quebec Precious Metals Announces First Closing of a Private Placement
- May 28, 2024 Quebec Precious Metals to Issue Shares in Payment of Debts and Deferred Share Units
- April 03, 2024 Quebec Precious Metals and Harfang Exploration Jointly Identify High-Priority Gold and Lithium Drill Targets on their Sakami and Serpent-Radisson Projects, James Bay Region, Quebec