Download PDF | View documents on Sedar
Montreal, November 15, 2023 â Quebec Precious Metals Corporation (TSX.V: QPM, FSE: YXEP, OTC-BB: CJCFF) (âQPMâ or the âCorporationâ) is pleased to announce the identification of drill targets. at the Ninaaskumuwin spodumene discovery (see press releases of October 24, 2023, and November 7, 2023). Drill targets have been confirmed following the completion of the follow-up prospecting program in the discovery area combined with geological mapping and structural interpretation.
âWe have been able to go from initial discovery to confirmation of drill targets in only a few weeks. The presence of a sill is significant as it suggests potential stacking which may define a large mineralized body. We plan to drill in early 2024. This is very encouraging and further validates the very high lithium exploration potential at Elmer East.â, commented Normand Champigny, CEO of QPM.
The discovery area is easily accessible from the paved Billy Diamond highway located about 50 km north of the âkm 381â rest stop that can provide accommodation, catering, fuel and power (Figure 1).
The lithium-bearing pegmatite body:
- is hosted in a metasedimentary unit comprised of sandstone, arenite and greywacke, which appears to have undergone ductile, polyphase deformation;
- has a length of 175 m, width of 42 m, and contains up to 15 â 20%, 3 â 55 cm-long, light-grey to light-green spodumene crystals, of varying grain size and orientation;
- is a shallowly dipping sill (rather than a steeply dipping dyke), with an estimated thickness of up to 5 m, but the true thickness remains unknown as the upper contact is above the current erosional level (Figure 2);
- is interpreted as forming in a late, extensional tectonic environment. The random orientation of spodumene crystals within the sill also supports the interpretation of an extensional regime. Extensional environments are favourable for forming stacks of sills (of varying dimensions), often connected by feeder dykes;
- has a mean orientation of 227 / 32° (average of contact and igneous banding measurements), and is interpreted to dip shallowly to the northwest under the marsh (Figure 3);
- remains untested at depth to the north and northwest of the outcrop, and untested near the surface and at depth, to the northeast (dives under a marsh, Figure 4); and
- can form significant open pit targets if they occur near surface due to the âflatâ/shallowly-dipping nature of sills (e.g., the Whabouchi lithium deposit near Nemaska, James Bay).
On the basis of this interpretation, QPM intends to:
- perform a diamond drilling program that aims to test: 1) the down-dip extent of the sill under the marsh to the north and northeast of the discovery outcrop, and 2) the presence of potential stacked sills; and
- carry out geological mapping during next spring in and around the discovery outcrop and collect additional structure measurements.
The first assay values from the prospecting campaign at Elmer East are expected towards the end of November.
The field work and geological interpretation were performed by GeoVector Management Inc. with the assistance of ALS GoldSpot Discoveries Ltd.
Qualified Person
Normand Champigny, Eng., Chief Executive Officer of the Company, and Qualified Person under NI 43-101 on standards of disclosure for mineral projects, has prepared and reviewed the content of this press release.
About Quebec Precious Metals Corporation
QPM is primarily focused on advancing its Sakami gold project, located in Eeyou Istchee James Bay territory in Quebec, near Newmont Corporation’s Eleonore gold mine. In addition, the Company holds a 68% interest in the Kipawa/Zeus rare earths project located near Temiscaming, Quebec. This is the only rare earths project in North America which has a fully completed feasibility study.
For more information please contact: Â
Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
nchampigny@qpmcorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSXÂ Venture Exchange)Â accepts responsibility for the adequacy or accuracy of this release.
- November 07, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- October 31, 2024 The Cree Hunters Economic Security Board, 16 Mining & Exploration Companies Contribute $750,000 For The Reconstruction Initiative Forest Fires Fund 2023, James Bay, Quebec
- October 30, 2024 Quebec Precious Metals Intersects 22.9 m of Spodumene-Bearing Pegmatite in the First Drillhole of its Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, James Bay, Quebec
- October 21, 2024 Quebec Precious Metals Begins Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, Situated Near the Galaxy Project to be Acquired by Rio Tinto, James Bay, Quebec, Announces Private Placement
- September 19, 2024 Quebec Precious Metals Congratulates Harfang Exploration on its High-Grade Gold Discoveries near the Sakami Project and Provides Update on Gold and Lithium Exploration Initiatives in James Bay
- August 09, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- July 17, 2024 Quebec Precious Metals Announces Results of Annual Shareholders Meeting, Grants Deferred Share Units and Stock Options
- June 27, 2024 Quebec Precious Metals Congratulates Ophir on its Spodumene Discovery near the Elmer East Project, James Bay, Quebec
- June 26, 2024 Quebec Precious Metals Granted Financial Support from Quebec Government for Lithium
- June 21, 2024 Quebec Precious Metals Announces Closing of Non-Brokered Private Placement
- May 31, 2024 Quebec Precious Metals Announces First Closing of a Private Placement
- May 28, 2024 Quebec Precious Metals to Issue Shares in Payment of Debts and Deferred Share Units
- April 03, 2024 Quebec Precious Metals and Harfang Exploration Jointly Identify High-Priority Gold and Lithium Drill Targets on their Sakami and Serpent-Radisson Projects, James Bay Region, Quebec
- February 29, 2024 Quebec Precious Metals Intersects 3.86 g/t Au over 8Â m and 2.37 g/t Au over 12.2Â m on its 100% owned Sakami Project