Download PDF | View documents on Sedar
Montreal, May 6, 2019 – Quebec Precious Metals Corporation (TSX.V: CJC, FSE: YXEN, OTC-BB: CJCFF) (“QPM” or the “Company”) and Lomiko Metals Inc. (TSX-V:LMR, OTC:LMRMF, FSE:DH8B) are pleased to announce the results from four (4) new exploration diamond drill hole received from the 2019 program (see Table 1 below, and Figure 1) at the Refractory Zone at the La Loutre graphite project (the “Project”). A total of 21 holes were completed on the Refractory Zone for a total of 2,985 metres. Results from the remaining 16 holes will be reported as they are received and compiled. QPM owns 20% of the Project.
Table 1: Results of the drill holes of the 2019 drill program. The width is drill indicated core length. Insufficient data exists to determine true width at this time.
Hole ID | UTM E | UTM N | Azimuth | Dip | Mineralization | Cg % |
||
---|---|---|---|---|---|---|---|---|
From (m) | To (m) | Interval (m) | ||||||
LL-19-04 | 499567 | 5098041 | 65.9 | -50 | 3.00 | 93.00 | 90.00 | 2.75 |
LL-19-14 | 499700 | 5097803 | 59.7 | -50 | 80.70 | 99.00 | 18.30 | 4.43 |
LL-19-15 | 499751 | 5097832 | 64.8 | -50 | 51.00 | 167.90 | 116.90 | 4.80 |
including | 152.70 | 167.90 | 15.20 | 18.04 | ||||
LL-19-16* | 499851 | 5097829 | 66.5 | -50 | 4.10 | 92.00 | 87.90 | 7.14 |
including | 70.50 | 91.50 | 21.00 | 15.48 |
||||
132.00 | 160.50 | 28.50 | 3.86 | |||||
LL-19-17 | 499894 | 5097804 | 78.2 | -50 | 15.00 | 62.30 | 47.30 | 7.56 |
including | 51.00 | 62.30 | 11.30 | 17.45 | ||||
96.00 | 126.00 | 30.00 | 1.96 |
The drill campaign focuses on the Refractory Zone. An independent technical report in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects, prepared by B. Turcotte and G. Servelle of InnovExplo Inc. from Val-d’Or, Québec, and O. Peters, of AGP Mining Inc., dated March 24, 2016, was filed for the Project’s Graphene-Battery Zone. The report presented a mineral resource estimate of 18.4 M Tonnes at a grade of 3.19% carbon flake graphite (“Cg”) in the Indicated category and 16.7 M Tonnes at 3.75% Cg in the Inferred category using a cut-off of 1.5% Cg. The Project also includes several untested anomalies.
On the basis of the available geophysical and 2016 drilling data, the strike length of the mineralization is estimated at 900 m in the NW-SE direction and is open in both directions. A detailed interpretation of the results will be carried out to better estimate the thickness and strike length of the mineralized zone.
The Project consists of contiguous claim blocks totaling 29 km2 situated approximately 53 km E of Imerys Carbon & Graphite, formerly known as the Timcal graphite mine, North America’s only operating graphite mine, and located 117 km NW of Montreal.
The 2019 exploration program is managed by Consul-Teck Exploration Miniere Inc. of Val-d’Or, Quebec, who designed the drilling campaign, supervised the program and logged and sampled the core.
Quality Assurance/Quality Control
Consul-Teck Exploration Miniere Inc. implemented QA/QC procedures to ensure best practices in sampling and analysis of the core samples. The drill core was logged and then split, with one half sent for assay and the other retained in the core box as a witness sample. Duplicates and blanks were inserted at a regular interval into the sample stream.
The samples in secure tagged bags were delivered directly to the analytical facility for analysis. In this case, the analytical facility was the ALS Minerals laboratory facility in Val-d’Or, Quebec. The samples are weighed and identified prior to sample preparation. The samples are crushed to 70% minus 2 mm, then separated and pulverized to 85% passing 75µm. All samples are analyzed for Cg using the C-IR18 method.
Qualified Person
Jean-Sebastien Lavallée (OGQ #773), Geologist, is a shareholder of both companies, VP Exploration of QPM and a Qualified Person under NI 43-101, has reviewed and approved the technical content of this release.
About Quebec Precious Metals Corporation
QPM is a new gold explorer with a large land position in the highly-prospective Eeyou Istchee James Bay region, Quebec, near Newmont Goldcorp Corporation’s ÉlĂ©onore gold mine. QPM’s flagship project is the Sakami project with significant grades and well-defined drill-ready targets. QPM’s goal is to rapidly explore this project to advance it to the mineral resource estimate stage.
For more information please contact:
Jean-François Meilleur
President
Tel.: 514 951-2730
jfmeilleur@qpmcorp.ca
Paradox Public Relations
Tel: 514 341-0408
Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
nchampigny@qpmcorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
- November 07, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- October 31, 2024 The Cree Hunters Economic Security Board, 16 Mining & Exploration Companies Contribute $750,000 For The Reconstruction Initiative Forest Fires Fund 2023, James Bay, Quebec
- October 30, 2024 Quebec Precious Metals Intersects 22.9 m of Spodumene-Bearing Pegmatite in the First Drillhole of its Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, James Bay, Quebec
- October 21, 2024 Quebec Precious Metals Begins Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, Situated Near the Galaxy Project to be Acquired by Rio Tinto, James Bay, Quebec, Announces Private Placement
- September 19, 2024 Quebec Precious Metals Congratulates Harfang Exploration on its High-Grade Gold Discoveries near the Sakami Project and Provides Update on Gold and Lithium Exploration Initiatives in James Bay
- August 09, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- July 17, 2024 Quebec Precious Metals Announces Results of Annual Shareholders Meeting, Grants Deferred Share Units and Stock Options
- June 27, 2024 Quebec Precious Metals Congratulates Ophir on its Spodumene Discovery near the Elmer East Project, James Bay, Quebec
- June 26, 2024 Quebec Precious Metals Granted Financial Support from Quebec Government for Lithium
- June 21, 2024 Quebec Precious Metals Announces Closing of Non-Brokered Private Placement
- May 31, 2024 Quebec Precious Metals Announces First Closing of a Private Placement
- May 28, 2024 Quebec Precious Metals to Issue Shares in Payment of Debts and Deferred Share Units
- April 03, 2024 Quebec Precious Metals and Harfang Exploration Jointly Identify High-Priority Gold and Lithium Drill Targets on their Sakami and Serpent-Radisson Projects, James Bay Region, Quebec
- February 29, 2024 Quebec Precious Metals Intersects 3.86 g/t Au over 8Â m and 2.37 g/t Au over 12.2Â m on its 100% owned Sakami Project