Download PDF | View documents on Sedar
Montreal, October 30, 2024 â Quebec Precious Metals Corporation (TSX.V: QPM, FSE: YXEP, OTC-BB: CJCFF) (âQPMâ or the âCorporationâ) is pleased to announce very encouraging preliminary visual results from the first drillhole as part of the exploration campaign for lithium on its Ninaaskumuwin project in the Eeyou Istchee James Bay region of Quebec, Canada (see press release dated October 21, 2024). The drilling campaignâs main objective is to test the extension at depth and along the strike of the discovery outcrop and the presence of potential stacked sills. Assay values from the nine samples from the discovery outcrop range from 1.10% to 3.92% Li2O.
In the first hole of the campaign (EE24-001), an interval of 22.9 m (from 127.95 to 150.85 m from surface, drilled at an angle of -60 degrees) spodumene-bearing pegmatite was intersected (see attached photo). Visually estimated spodumene in drill core ranges from 3% to 50% over the intersected pegmatite.
Preliminary interpretation shows that the spodumene pegmatite body dips at about -57 degrees to the north, even though surface indications suggested dip of about 30 degrees. The spodumene pegmatite body remains open along strike and to depth and more drilling is being performed to more precisely determine its geometry and extension.
The pegmatite is composed essentially of quartz, plagioclase, potassic feldspar and spodumene with lesser proportion of muscovite, tourmaline and garnet. The spodumene is light greenish-white colour and occurs as large and elongated crystals averaging 2 x 5 cm and up to 2 x 15 cm. A portion of the pegmatite shows albite alteration in which spodumene is concentrated in bands of fine-grained crystals. The pegmatite is hosted in metasedimentary units, mainly matrix-supported conglomerate in alternance with wacke and coarse-grained sandstone.
âWe are very impressed to obtain such a positive result on the first drillhole. We look forward to seeing the results from the next drillholes.â commented Normand Champigny, CEO.
The Ninaaskumuwin lithium prospect is easily accessible from the paved Billy Diamond highway located about 60 km north of the âkm 381â rest stop that can provide accommodation, catering, fuel and power. It is also about 50 km north of the Galaxy project, which is being acquired by Rio Tinto plc as part of their recently announced acquisition of Arcadium Lithium plc for USD$6.7 billion.
GeoVector Management Inc., based in Ottawa, is supervising the drilling program, which includes core logging and sampling of the drill core. The QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results. Drilling is performed by RJLL Drilling, based in Rouyn-Noranda.
Qualified Persons
Normand Champigny, Eng., Chief Executive Officer of the Company, and Dr. Ăric Hebert, P.Geo., Senior Geological consultant, member (#0842) of the Ordre des GĂ©ologues du QuĂ©bec, are both qualified persons within the meaning of National Instrument 43-101 on standards of disclosure for mineral projects. They have reviewed and approved the technical information contained in this press release.
About Quebec Precious Metals Corporation
QPM has a large land position in the highly prospective Eeyou Istchee James Bay territory, Quebec, near Newmont Corporationâs ĂlĂ©onore gold mine. The Corporation focuses on advancing its Sakami gold project and its newly discovered, drill-ready Ninaaskuwin lithium showing on the Elmer East project. In addition, the Corporation holds a 68% interest in the Kipawa rare earths project located near Temiscaming, Quebec.
For more information please contact:Â
Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
nchampigny@qpmcorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements
This release includes forward-looking statements. Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as âmayâ, âwillâ, âexpectâ, âintendâ, âplanâ, âestimateâ, âanticipateâ, âcontinueâ, and âguidanceâ, or other similar words and may include, without limitation statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production output.
Forward-looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of resources or reserves, political and social risks, changes to the regulatory framework within which the entity operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward-looking statements are based on the entity and its managementâs good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect business and operations in the future. There are no assurances that the assumptions on which forward-looking statements are based will prove to be correct, or that the business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the entity or management or beyond the entityâs control.
Although there have been attempts to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward-looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be anticipated, estimated or intended, and many events are beyond the reasonable control of the entity. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.
Forward-looking statements in this release are given as at the date of issue only. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the entity does not undertake any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
Drillhole EE24-001, core samples from 134.98 m to 146.62 m, visually estimated spodumene of 14%.
- October 31, 2024 The Cree Hunters Economic Security Board, 16 Mining & Exploration Companies Contribute $750,000 For The Reconstruction Initiative Forest Fires Fund 2023, James Bay, Quebec
- October 30, 2024 Quebec Precious Metals Intersects 22.9 m of Spodumene-Bearing Pegmatite in the First Drillhole of its Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, James Bay, Quebec
- October 21, 2024 Quebec Precious Metals Begins Maiden Drilling Program on its 100% Owned High-Grade Lithium Ninaaskumuwin Discovery, Situated Near the Galaxy Project to be Acquired by Rio Tinto, James Bay, Quebec, Announces Private Placement
- September 19, 2024 Quebec Precious Metals Congratulates Harfang Exploration on its High-Grade Gold Discoveries near the Sakami Project and Provides Update on Gold and Lithium Exploration Initiatives in James Bay
- August 09, 2024 Quebec Precious Metals to Issue Shares in Payment of Services and Deferred Share Units
- July 17, 2024 Quebec Precious Metals Announces Results of Annual Shareholders Meeting, Grants Deferred Share Units and Stock Options
- June 27, 2024 Quebec Precious Metals Congratulates Ophir on its Spodumene Discovery near the Elmer East Project, James Bay, Quebec
- June 26, 2024 Quebec Precious Metals Granted Financial Support from Quebec Government for Lithium
- June 21, 2024 Quebec Precious Metals Announces Closing of Non-Brokered Private Placement
- May 31, 2024 Quebec Precious Metals Announces First Closing of a Private Placement
- May 28, 2024 Quebec Precious Metals to Issue Shares in Payment of Debts and Deferred Share Units
- April 03, 2024 Quebec Precious Metals and Harfang Exploration Jointly Identify High-Priority Gold and Lithium Drill Targets on their Sakami and Serpent-Radisson Projects, James Bay Region, Quebec
- February 29, 2024 Quebec Precious Metals Intersects 3.86 g/t Au over 8Â m and 2.37 g/t Au over 12.2Â m on its 100% owned Sakami Project
- January 18, 2024 Quebec Precious Metals Reports High-Grade Lithium up to 3.9% Li2O at Surface at the Drill-Ready Ninaaskumuwin Discovery, Situated along a 3.8 km-long, Highly Prospective pXRF Trend on its 100% Owned Elmer East Project, James Bay, Quebec